Skip to content
MMIP
  • MMIP Home
  • Board
  • Employment
  • Blog
  • News
  • Contact Us
  • Projects
    • SR 400 Express Lanes
    • I-285/I-20 East Interchange
    • 16@95 IMPROVEMENTS
    • I-285/I-20 West Interchange
    • I-285 Eastside Express Lanes
    • I-285 Top End Express Lanes
    • I-285 Westside Express Lanes
    • I-75 Commercial Vehicle Lanes
    • I-85 Widening, Phase I
    • I-85 Widening, Phase II (SR 53 to US 129)
    • I-285 Advanced Projects
  • Georgia Express Lanes
Site Search

Requests were made to incorporate previous local studies of…

  • July 31, 2019July 31, 2019
  • by Kailash Lala

Current traffic data are being used in close coordination with the City of Roswell and a review of its previous local studies to best design the Holcomb Bridge Road Interchange.

Concerns were raised over the construction alternatives presented at the Public Information Open Houses. Commenters requested that the Pitts Road overpass be rebuilt in its existing location resulting in the bridge being closed during construction and local traffic being detoured during construction resulting in a reduced right-of-way and displacements need.
Concerns were raised by residents related to widening the Spalding Drive Bridge, predicting an increase in commuter traffic on Spalding Drive. Additional traffic calming measures were requested.

Unable to load Tweets

Follow
© Georgia Department of Transportation All Rights Reserved | Privacy Notice